The company has provided its services to various industries including utility manufacturing, high rise buildings, oil and gas, chemical plants and power stations. Some of the projects undertaken by the company are summarised as follows:

Transmission & Distribution Substations
1. Commissioning test of Semenyih 132/33/11kV TNB Substation (1995).
2.Commissioning test of Cheras Jaya 132/33/11kV TNB Substation (1995-96).
3.Commissioning test of Ikatan 33/11kV TNB Substation (1996).
4.Commissioning test of Rawang 132/33/11kV TNB Substation (1997).
5.Commissioning test of Temasya 132/33/11kV TNB Substation (1998).
6.Commissioning test of Cyberjaya 132/33kV TNB Substation (2001).
7. Commissioning test of Bahau 132/33kV TNB Substation (2003-04).
8.Commissioning test of Seremban 2 132/33kV TNB Substation (2004-06).

Power Stations
1. Commissioning test of phase 2, Melaka Power Station TNB (1x Steam Turbine) (1996-97).
2.Commissioning test of 132/11kV and LV system for Sabah IPP 4x30MW power station, Kota Kinabalu (1998).
3.Maintenance of protection equipment for Powertek Power Station, Melaka (4x Gas Turbine) (1998-2007).
4.Maintenance of protection equipment for Melaka Power Station (TNB), (Now Pahlawan Power, Powertek) (2x Gas Turbine) (1998-2007).
5.Maintenance of protection equipment for Lumut Power Station, Segari (6x Gas Turbine & 2x Steam Turbine) (1998-2007).
6.Maintenance of protection equipment for 1x500MW Kapar Power Station, TNB (2002-2007).
7. Maintenance of protection equipment for Pasir Gudang Power Station, TNB (2001-2007).
8.Maintenance of protection equipment for Gas Turbines Lumut Power Station (2004-2007).
9.Relay calibration for 11kV at Steam Turbine Generator (2004).
10.Relay calibration Panel ( Phase 2 ) at Pahlawan Power,Tg. Kling,Melaka ( 2004 )
11.Relay calibration for Unit GT 12 &13 at Lumut Power Plant, Perak (2004-2007).
12.Relay calibration for 33/6.6kV at Genting Sanyen Power S/B, Kuala Langat (2004-2007).
13.Relay calibration for Generator GT3B at Sultan Iskandar Power Station, Pasir Gudang, Johor Bahru (2004-2007).
14.Relay calibration for 275kV Control Panel at Powertek, Melaka (2004-2007).
15.Breaker timing test for 33/11kV at PPM Bank Negara, KL (2004).
16.Generator Protection relay calibration at Kapar Energy Ventures, Power Station, Kapar, Selangor (2005-2007).
17.Protection relay calibration at Sultan Iskandar Power Station, Pasir Gudang, J.Bahru (2000-2007)

Oil and Gas Industry
A. Commissioning Project
1. Commissioning test of 33/11/6.6kV system, Shell Middle Distillate Synthesis, Bintulu (1991-92).
2.Commissioning test of 132kV GIS Substation, Shell Refinery, Port Dickson (1995-2006).
3.Commissioning test of 11kV and LV system, Multi Product Pipeline Project for Shell Refinery, Melaka (1996).
4.Commissioning test of 33/11/6.6kV and LV system, LPG Facilities Project, Bintulu (1998).

B. Maintenance
1. Maintenance of protection equipment for Bekok Platforms, Petronas (1997).
2.Maintenance of protection equipment for Dulang Platforms, Petronas (1998).
3.Maintenance of protection equipment for Onshore Gas Terminal, Kerteh (1998).
4.Maintenance of protection equipment for Center Utility Facilities (CUF), Gebeng (33/11/6.6/0.415kV system) (2001/2002).
5.Maintenance of protection equipment for Center Utility Facilities (CUF), Kerteh (33/11/6.6/0.415kV system) (2001/2002).
6.Maintenance of protection equipment for 132/33/6.6kV panels for Shell Refinery, Port Dickson (2002).
7.Maintenance test for protection relay at Offshore Bekoh A, Tiong A, Terengganu (2004).
8.Relay calibration at Petronas Fertilizer (Kedah) S/B, Gurun, Kedah (2005).
9.Maintenance of protection equipment for CUF Gebeng (2002-2004).
10.Maintenance of protection equipment for Shell Refinery, Port Dickson (2003-2007).
11.Maintenance of protection equipment for offshore Bekok-A and Tiong-A (2004).

Co-generation Plants
1. Commissioning test of 33/11/6.6kV system for Co-generation Plant, Kuala Lumpur International Airport (KLIA) (1997).
2.Commissioning test of 33/11/6.6kV system for Co-generation Plant, Putrajaya (1998).
3.Commissioning test of 11/6.6/3.3/0.415kV system for Co-generator Plant, Precinct 2, Putrajaya. (2003).
4.Commissioning test of 11/3.3/0.415kV system for Gas Distribution Cooling (GDC) Plant, Precinct 5, Putrajaya. (2004 / 2005).
5.5. Maintenance test for 11/0.415kV at K.Jelai Water Supply Project, N. Sembilan (2004).
6.Maintenance test for 11/0.415kV at Loji Pembersihan Air Rasa, Hulu Selangor (2004).
7.Commissioning test for 11/0.415kV MCC 5/8 at GDC Plant 1, Putrajaya (2004).
8.Relay calibration for 11/0.415kV at DAM Sg. Terip water work, Seremban (2006).

Transportation System
1. Commissioning test of 11kV & LV system for Track Transit Project, Kuala Lumpur International Airport (KLIA) (1997).
2.Commissioning test of 33kV & LV system for Paramount, Asiajaya, University, Abdullah Hukum, Kerinchi, Bangsar, Kg. Baru & Benteng Stations, Putra LRT Project, Kuala Lumpur.
3.Maintenance test for 415kV at Wisma Singapore Airline, Kuala Lumpur (2004).

Petro-chemical Industry
1. Commissioning test of 132/11/6.6kV and LV system for BP Chemicals, Kuantan (1995-96).
2.Maintenance of protection equipment for Petronas Methanol, Labuan (1997).
3.Maintenance of protection equipment for MTBE Polypropylene, Kuantan 132/6.6kV (2001).
4.Commissioning test of 11/0.415kV and LV system for Amoco Chemicals expansion plant, Kuantan (2001-2007)
5.Maintenance Works of 132/11/6.6kV and LV system for BP Chemicals (M) Sdn Bhd, Kuantan (2002-2007).
6.Maintenance test for 11/0.415kV at Flexsys Chemical (M) S/B Cap2 Project, Gebeng, Kuantan (2004-2007).
7.Maintenance test for 11/0.415kV at W.R Grace Specialist Chemical (M) S/B, Gebeng, Kuantan (2004-2007).
8. Maintenance test for 415V at Dipsol (M) S/B , Banting (2004-2007).
9.Maintenance test for 132/11/6.6/0.415kV at BP Chemical (M) S/B, Gebeng, Kuantan (2004-2007).
10.Maintenance test for 22/0.415kV at CCM Chemical, Johor Bahru (2005-2007).
11.Maintenance test for 11/0.415kV at Cryovac, Gebeng, Kuantan(2005-2007).
12.Maintenance test for 11/0.415kV at Nestle Foods, Petaling Jaya (2005-2007).
13.Relay calibration for 132/33kV at CUF, Gebeng, Kuantan (2004).
14.Relay calibration for 11/0.415kV at Oletin Plant, Optimal (M) S/B, Kerteh, Terengganu (2004-2007).

Manufacturing Industries
1. Commissioning test of 132kV Substation, Ji Kang Dimensi Steel Plant, Kuantan (1997).
2.Commissioning test of 132kV GIS substation for Malayan Oxygen, Bukit Rajah, Klang (2002).
3.Maintenance of 11/0.415kV protection equipment for SKF Bearing Industry, Nilai. (2001-2007).
4. Maintenance of 11/0.415kV protection equipment for Infineon Technologies (M) Sdn. Bhd., Malacca (2001-2007).
5.Commissioning test of 33/11kV Substation, Proton Plant, Tg Malim (2002-3).
6.Commissioning test for 415V at Wang Zheng, Rawang (2004).
7.Relay calibration for 11kV at Ornasteel, Melaka (2004-2007).
8.Maintenance test for 11/0.415kV at Seng Yip, Balakong (2004).
9.Maintenance test for 11/0.415kV at Sumitomo Sintered, Shah Alam (2004-2007).
10.Maintenance test for 11/0.415kV at Premier Milk, Petaling Jaya (2004-2007).
11.Maintenance test for 11/0.415kV at George Kent, Puchong (2004-2007).
12.Maintenance test for 11/0.415kV at Federal Power, Meru (2004-2007).
13. Maintenance test for 11/0.415kV at Infineon Technologies (M) S/B, Bukit Meredam, Melaka (2004-2007).
14.Maintenance test for 11/0.415kV at F&N Foods, Petaling Jaya (2004-2007).
15.Maintenance test for 11/0.415kV at Brass Alloys, Jln Kapar, Klang (2004-2007).
16. Maintenance test for 11/0.415kV at Malaysia Cocoa, Seremban (2004-2007).
17.Maintenance test for 11/0.415kV at San Miguel Woven Products S/B (2004-2007).
18.Maintenance test for 33/11/0.415kV at Toshiba, Banting (2004-2007).
19.Relay calibration for 132/11/0.415kV at Ji Kang Dimensi S/B, Gebeng, Kuatan (2004-2007).
20. Relay calibration for 415V at Western Digital (M) S/B, Sg. Way, Petaling Jaya (2004-2007).
21.Relay calibration for 11/0.415kV at Amsteel Mills S/B, Bukit Raja (2004-2007).
22.Relay calibration for 11/0.415kV at Central Sugar Refinery, Shah Alam (2004-2007).
23.Commissioning test for 11/0.415kV at Seowan Precision Glass (M) S/B, Perindustrian Chembung, Mukim Rembau, N. Sembilan (2004-2007).
24.Relay calibration for 6.6/0.415kV at Genting Sanyen Industrial Paper, Kuala Langat (2005-2007).
25. Maintenance test for 11/0.415kV at MCM3, Shah Alam (2006-2007).
26.Maintenance test for 11/0.415kV at PCOM, Sg. Way(2006-2007).
27.Maintenance test for 11/0.415kV at Bridgestone Sporting Goods, Bukit Kemuning, Shah Alam (2006-2007).
28. Maintenance test for 11/3.3/0.415kV at Chunghwa Picture Tubes, Shah Alam (2006-2007).
 
Buildings
1. Electrical Audit at Petronas Twin Towers KL CC, Kuala Lumpur (1999).
2.Maintenance of protection equipment for IMC building, Kuala Lumpur (2001).
3.Maintenance of protection equipment for Public Bank building, Kuala Lumpur (2002).
4. Electrical Audit at PNB, Kuala Lumpur (2001).
5.Electrical Audit at Petronas Bangi Data Center (2001).
6.Electrical Audit at MAS Computer Data Center (2003).
7.Electrical Audit at New Zealand High Commission (2003).
8.Electrical Audit at Exxon Mobil Data Center (2005).
9.Maintenance of protection equipment for Public Bank building, Ipoh (2007)
10.Maintenance of protection equipment for HSBC, Klang (2007)
11.Maintenance of protection equipment for Imbi Plaza, Kuala Lumpur (2007)
 
 We have also provided maintenance and commissioning services of protection equipment, switchgears and transfomers up to voltage level of 275kV in various sectors other than above.